Painting Contractor in Singapore

What we paint

Interior walls to high-rise exteriors

Good paint does more than change colour. It protects surfaces, hides wear and shapes how your building looks to customers, staff and residents. We paint offices, shops, factories and residential buildings, from interior walls to high-rise exteriors.

Painter rolling an office ceiling
01

Interior walls and ceilings

Offices, shops and homes repainted with proper preparation and protection for floors and furniture.

Painters repainting a building facade from a scaffold
02

Exterior walls and facades

Weather-resistant exterior paint that protects the wall as well as refreshing the look.

Painting a common stairwell wall
03

Corridors, staircases and common areas

Busy areas repainted in phases so people can keep moving through the building.

Coating a factory floor
04

Factories, warehouses and industrial floors and structures

Walls, steelwork and floors painted around your production schedule and site safety rules.

Painting a restaurant feature wall
05

Shop and restaurant interiors

Quick turnarounds after hours or before opening, so you lose as little trading time as possible.

Repainting a condominium car park
06

Condominium blocks and car parks

Block and car park repainting, planned with the management office and residents.

Who it is for

Office tenants and owners, retail and F&B operators, factory and warehouse managers, condominium management councils and homeowners.

How a painting job works

Preparation decides how long paint lasts

05 steps

01

Site visit

We check surfaces, access and the condition of the existing paint.

02

Quote

You get the area, number of coats and paint specification in writing.

03

Preparation

We clean, repair, fill and prime. This step decides how long the paint lasts.

04

Painting

We apply the coats, protecting floors, furniture and fittings.

05

Final check

We touch up and hand over a clean area.

Repair and redecoration services for residential and commercial buildings in Singapore

Repair before paint

Paint over a problem and it comes back

Paint over cracks, damp or peeling areas and the problem comes back. Our repair team fixes the surface first, so the new paint lasts.

How we work around you

Painting at height

Tall buildings do not always need full scaffolding. We use rope access for suitable facade and high-rise work.

Painting that fits your schedule

Offices and shops cannot always close. We can plan work in phases, after hours or on weekends where building rules allow.

Why Whoosh for painting

Our repair and painting teams work together, so cracks and damp are fixed before paint goes on. We can also reach tall facades with rope access, and plan work in phases for occupied buildings.

What affects the cost

How long it takes

It depends on the area, number of coats, drying time and access. We give a schedule in the quote.

Scissor lift in a warehouse during industrial works

Signs it is time to repaint

When a fresh coat is due

What you get

How to prepare

Tell us which areas you want painted, whether you need a colour match, and your working hours. Send the paint code if you have it. Clear walls of items we should not move, and let us know about any areas that must stay open.

FAQ

Frequently asked questions

Not covered here? Send us a photo and we will tell you what is likely needed.

How long will a repaint take?

It depends on the area, the number of coats and access. We give a schedule in the quote.

Yes. Tell us the paint code if you have it, or we can match from a sample.

Yes. See our Condo and MCST page.

Often yes, with phasing, after-hours or weekend work, if building rules allow.

The quote states the paint specification and number of coats.

It depends on the paint and the area. We tell you drying times and plan the work so you can reopen safely.

We protect floors, furniture and fittings during painting. For large moves, we agree the arrangement with you first.

Get a free quote

Request a painting quote

Send us a description and photos, or call +65 6029 3124.