Typical office reinstatement scope
Moving out of an office means handing it back the way your lease says. That can mean taking down partitions, removing cabling and fittings, repairing the walls and floors and repainting. We handle the whole job so you can focus on the move.
Partitions, meeting rooms and cabinets taken down and removed from site.
Cabling, points and lighting you added removed and made safe.
Ceilings, flooring and carpet returned to the specification in your lease.
Pantry pipes and drains disconnected and capped.
Fixings and damage made good, then repainted to the landlord's finish.
Debris removed and the office cleaned, ready for inspection.
Your lease will say what must be reinstated. Some landlords require the original layout, others accept a clean, empty shell. We read the clause with you.
How it works
05 steps
We read what the lease asks for and note your deadline.
We measure, check what was added and give a clear scope and price.
We arrange work permits, lift bookings and work hours.
Removal, hacking, capping, repair and painting, in an order that avoids rework.
We walk through with you and the landlord and fix any points raised.
Timeline before your lease ends
Many offices need time for quotes, approvals from building management and scheduling around building hours. If you are close to the end date, tell us. We will say what is possible.
We complete a walk-through with you and, where possible, with the landlord's representative. If points are raised, we fix them promptly so the unit can be accepted.
Hacking and demolition, repair and redecoration, painting, and electrical and plumbing capping are done by our own teams, so one contractor is responsible from start to finish.
Related services
We return your space to the condition your lease requires.
Controlled removal of walls, floors and fittings, with debris cleared.
Cracks, ceilings, walls, tiles and leaks, repaired and finished neatly.
Interior, exterior and high-rise painting, with the surface prepared first.
New installation, fault finding, distribution boards and lighting, tested before handover.
Installation, repair and maintenance of water supply, drainage, toilets and pantries.
FAQ
Not covered here? Send us a photo and we will tell you what is likely needed.
Often yes, if building management allows it.
Your lease reinstatement clause, floor plan if available, and the handover date.
By the size of the office, what was built, and the finish required.
It depends on your lease. We read the clause with you and quote what it requires.
We fix the points raised so the unit can be accepted. Tell us the landlord's requirements early.
Get a free quote
Send us a description and photos, or call +65 6029 3124.
WhatsApp us