Office Reinstatement in Singapore

Typical office reinstatement scope

Everything your lease asks for

Moving out of an office means handing it back the way your lease says. That can mean taking down partitions, removing cabling and fittings, repairing the walls and floors and repainting. We handle the whole job so you can focus on the move.

Office unit stripped back during reinstatement
01

Removing glass or drywall partitions, meeting rooms and built-in cabinets

Partitions, meeting rooms and cabinets taken down and removed from site.

02

Taking out data cabling, power points and lighting you added

Cabling, points and lighting you added removed and made safe.

03

Removing or restoring ceiling, flooring and carpet to the original specification

Ceilings, flooring and carpet returned to the specification in your lease.

04

Disconnecting and capping plumbing for pantries you added

Pantry pipes and drains disconnected and capped.

05

Repairing and repainting walls and ceilings

Fixings and damage made good, then repainted to the landlord's finish.

06

Final cleaning and debris removal

Debris removed and the office cleaned, ready for inspection.

Your lease will say what must be reinstated. Some landlords require the original layout, others accept a clean, empty shell. We read the clause with you.

How it works

From lease clause to handover

05 steps

01

Send your lease clause, floor plan and handover date

We read what the lease asks for and note your deadline.

02

Site visit and quote

We measure, check what was added and give a clear scope and price.

03

Approvals and scheduling with building management

We arrange work permits, lift bookings and work hours.

04

Works, in the right order

Removal, hacking, capping, repair and painting, in an order that avoids rework.

05

Landlord inspection and handover

We walk through with you and the landlord and fix any points raised.

Morning safety briefing on site

Timeline before your lease ends

Start the conversation early

Many offices need time for quotes, approvals from building management and scheduling around building hours. If you are close to the end date, tell us. We will say what is possible.

Handover and landlord inspection

We complete a walk-through with you and, where possible, with the landlord's representative. If points are raised, we fix them promptly so the unit can be accepted.

Works that go with reinstatement

Hacking and demolition, repair and redecoration, painting, and electrical and plumbing capping are done by our own teams, so one contractor is responsible from start to finish.

What affects the cost

FAQ

Frequently asked questions

Not covered here? Send us a photo and we will tell you what is likely needed.

Can you work after hours or on weekends?

Often yes, if building management allows it.

Your lease reinstatement clause, floor plan if available, and the handover date.

By the size of the office, what was built, and the finish required.

It depends on your lease. We read the clause with you and quote what it requires.

We fix the points raised so the unit can be accepted. Tell us the landlord's requirements early.