Shop and F&B Reinstatement in Singapore

What shop and F&B reinstatement can include

Shopfronts, kitchens and wet areas

Shops and restaurants usually have tight handover dates, strict mall rules and heavy fit-outs to remove. We restore your unit to the condition your lease requires and help you return it on time.

Kitchen equipment being removed from an F&B unit
01

Removing shopfronts, signage and display fittings

Shopfronts, signboards and display fittings dismantled and removed.

02

Taking out counters, shelving and built-in furniture

Counters, shelving and built-in furniture taken out and disposed of.

03

Removing kitchen equipment, hoods and extraction ducting you installed

Kitchen equipment, hoods and ducting removed, and openings sealed.

04

Disconnecting and capping plumbing, grease traps and drainage works

Grease traps, drains and water points disconnected and capped to mall requirements.

05

Capping or removing electrical and gas connections as the lease and regulations require

Electrical points made safe and gas lines capped by the right licensed worker.

06

Repairing floors and walls, especially in wet areas

Wet-area floors and walls repaired, including waterproofing where needed.

07

Repainting and final cleaning

Unit repainted to the landlord's finish and cleaned for handover.

How it works

Planned around mall rules

05 steps

01

Send your lease clause, mall guidelines and handover date

We check what your lease and the mall's guidelines require.

02

Site visit and quote

We inspect the unit and quote the full scope, including kitchen works.

03

Approvals and scheduling with mall management

We submit permits and book work hours, loading bays and lifts.

04

Works, including kitchen and wet-area removal

We remove the fit-out, repair and repaint, keeping common areas clean.

05

Landlord inspection and handover

We attend the inspection with you and fix any points raised.

Commercial reinstatement and renovation services in Singapore

Working within mall rules

Planned around hours, routes and lifts

Malls often have rules on working hours, noise, delivery routes, lift use and debris removal. We plan the job around them and keep the area clean.

Kitchens and wet areas

Kitchens bring extra work: waterproofing, floor repair, grease and drainage. We take care of these so the unit is accepted by the landlord.

What affects the cost

FAQ

Frequently asked questions

Not covered here? Send us a photo and we will tell you what is likely needed.

Can you work at night?

Often, if the mall allows.

Yes. Pop-up shops and kiosks are usually quicker jobs, and we can often fit them around mall closing hours.

Yes. Early quotes help you plan your budget and your move.

We include this in the scope if your lease requires it.

Your lease clause, mall guidelines if you have them, photos and your handover date.

Get a free quote

Get a reinstatement quote

Send us a description and photos, or call +65 6029 3124.