Hacking and Demolition Works in Singapore

What we hack and demolish

Controlled removal, debris cleared

Hacking is noisy, dusty and needs care. We remove walls, floors, ceilings and fittings in a controlled way, clear the debris and leave the space ready for the next step, whether that is reinstatement, renovation or a new fit-out.

Walls, partitions and built-in structures
01

Walls, partitions and built-in structures

Brick, block, drywall and glass partitions removed without damaging what stays.

Floor screed and tiles
02

Floor screed and tiles

Tiles and screed hacked back to the slab, ready for new flooring or reinstatement.

Ceilings and bulkheads
03

Ceilings and bulkheads

False ceilings and bulkheads taken down, with the services above made safe.

Toilets, pantries and wet areas
04

Toilets, pantries and wet areas

Fittings, tiles and old waterproofing removed from wet areas, with pipes capped.

Fixed counters, cabinets and fittings
05

Fixed counters, cabinets and fittings

Built-in counters, cabinets and joinery dismantled and taken away.

Who it is for

Tenants ending a lease, owners renovating, and contractors who need a space cleared before a fit-out. Offices, shops, restaurants, factories and homes.

How a hacking job works

We check what is behind before we hack

06 steps

01

Site visit

We see what is to be removed and check access and building rules.

02

Check what is behind

We check for pipes, cables and structure before we hack.

03

Quote and schedule

You get a scope, price and a plan that fits noise-hour limits.

04

Hacking

We work in a controlled order, with covers and cleaning to limit dust.

05

Debris removal

We take away what we remove and leave the area clear.

06

Handover

We check the result with you.

Site team at a safety briefing

How we keep it safe and controlled

Noise, dust and safety under control

Hacking before reinstatement or renovation

Most hacking jobs are the first step of something bigger. If you need reinstatement, we continue from hacking to repair and repainting. If you are renovating, we leave the space clean and ready for the next contractor, or we continue with the works.

What affects the cost

How long it takes

It depends on the area and what is removed. We give a schedule in the quote and tell you the noisiest days.

Office unit being reinstated at the end of a lease

When you need hacking

Common reasons to call us

What you get

How to prepare

Tell us what is to be removed and give us building management's working-hour and noise rules. Send any drawings you have. Clear valuables and sensitive items from the area before we start.

FAQ

Frequently asked questions

Not covered here? Send us a photo and we will tell you what is likely needed.

Do I need approval before hacking?

Often you need approval from building management, and sometimes from the authorities, depending on what is removed. Tell us what you plan and we will tell you what is typically required.

It is noisy. We plan around your neighbours' hours and building rules.

Often yes, with careful scheduling, dust control and clear notices. We discuss this at the site visit.

We take away what we remove and leave the area clear.

We check for pipes, cables and structure before we start, and plan around them.