What reinstatement involves
When a lease ends, most landlords expect the space to be returned to its original condition. Reinstatement is how you do that: removing what you added, repairing what changed and handing the unit back so the landlord accepts it. We plan and complete the whole job, so your handover date is not at risk.
Everything you installed taken down and removed from site.
Built walls, raised floors and structures hacked out in a controlled way, within building noise hours.
Points, pipes and units you added removed or safely capped, as the lease requires.
Holes, fixings and damage made good so surfaces match the original condition.
Walls and ceilings repainted to the colour and finish your landlord specifies.
Debris removed and the unit cleaned, ready for the landlord's inspection.
Some landlords also ask for the original layout, ceiling or floor finishes. Send us your lease clause and we will tell you what is required.
Offices, shops and industrial units
The work differs by type of space. See our pages for office reinstatement, shop and F&B reinstatement, and factory and industrial units.
Our process
06 steps
We check the reinstatement clause and any landlord or management guidelines.
We measure, look at what was added and note what needs removing or restoring.
You get a scope and price you can compare.
We arrange works to meet building rules, noise limits and your handover date.
We remove, repair and restore in the right order.
We walk through with you, and with the landlord's representative where possible, and fix any points raised.
Plan early
The best time to contact us is as soon as you know your lease is ending, or before you renew. Early planning avoids rushed work, overlapping rent and disputes at handover.
Reinstatement touches several trades. Because our own teams do the hacking, repair, painting and capping works, you deal with one contractor and one accountable team, instead of coordinating several against a fixed handover date.
Small units can take days; larger or heavily fitted-out spaces take longer. The timeline depends on scope, building access hours and approvals. We give a realistic schedule in the quote. If your handover date is close, tell us at the start.
Avoid delays
What you get
Related services
Controlled removal of walls, floors and fittings, with debris cleared.
Cracks, ceilings, walls, tiles and leaks, repaired and finished neatly.
Interior, exterior and high-rise painting, with the surface prepared first.
New installation, fault finding, distribution boards and lighting, tested before handover.
Installation, repair and maintenance of water supply, drainage, toilets and pantries.
FAQ
Not covered here? Send us a photo and we will tell you what is likely needed.
Returning a rented space to the condition your lease requires when you move out.
It depends on your lease. Many commercial leases require it, so check the reinstatement clause or ask us to read it with you.
Yes. We follow the landlord's or building management's guidelines and can be present at the inspection.
Yes. We handle hacking, repair, painting, plumbing and electrical capping, so one team is accountable for the result.
We fix the points raised at the inspection so the unit can be accepted. Tell us the landlord's requirements at the start so we plan for them.
Often yes, once your own removal is done or phased. We plan the order with you.
Your lease reinstatement clause, floor plan if you have one, photos and your handover date.